What is LWR?
LWR (Lost Workday Rate) is an OSHA-style severity metric that counts how many workdays were lost to occupational injury or illness — expressed per 100 full-time workers (a 200,000-hour base).
Unlike LTCR (which counts days-away cases), LWR counts days. One long absence can raise LWR far more than LTCR. It is the OSHA-style twin of international severity rate: same lost days, different hour base (ISO severity = LWR × 5).
This free LWR calculator runs the OSHA-style formula in your browser and shows the million-hour ISO equivalent for the same inputs.
Lost Workday Rate (LWR) Calculator
LWR · Lost Workday Rate
Lost workdays per 100 full-time workers (200,000-hour base) — a severity metric, not a case-count rate. Equivalent to ISO severity rate ÷ 5. Pair with LTCR (cases) for the full picture.
Formula: LWR = (Lost Workdays × 200,000) ÷ Total Hours Worked
- LWR counts days lost; LTCR counts lost-time cases — one long absence raises LWR more than LTCR.
- ISO severity = LWR × 5 for the same days and hours — label the base every time.
- Hours should be hours actually worked — not paid leave, holidays, or vacation.
How to calculate LWR
The standard OSHA-style formula is:
LWR = (Lost Workdays × 200,000) ÷ Total Hours Worked
The 200,000 base represents 100 employees working 40 hours per week for 50 weeks.
| Input | What to enter |
|---|---|
| Lost Workdays | Total scheduled workdays lost to occupational injury or illness in the period. Count days, not cases. |
| Total Hours Worked | Hours actually worked by employees in scope, including overtime. Exclude paid non-work time (vacation, sick leave, holidays). |
Worked example
A plant records 120 lost workdays and 800,000 hours worked:
LWR = (120 × 200,000) ÷ 800,000 = 30.00
The ISO severity rate on a million-hour base for the same data is 150.00 (LWR × 5). Always state which base you are using.
What counts as a lost workday
- Usually count: scheduled workdays the injured person could not work because of the injury/illness.
- Do not confuse with cases: one injury causing 10 days away is 10 lost workdays for LWR, but one case for LTCR.
- Restricted work: may or may not count depending on your procedure — state the rule next to the KPI.
- Fatalities: some older schemes charge a fixed day total; modern practice often tracks fatalities separately. Be explicit.
LWR vs severity rate, LTCR, and DART
Severity rate (ISO-style) uses 1,000,000 hours: ISO = LWR × 5 for identical days and hours.
LTCR counts days-away cases on the same 200,000 base — frequency of lost-time events, not days lost.
DART counts days-away / restricted / transfer cases, not days. Use LWR with LTCR/DART for a full lagging picture.
Browse every free tool on the safety calculators hub.
How to interpret your LWR result
There is no universal “good” LWR. Day-counting rules vary, so peer comparisons only work like-for-like.
- Light lost-day burden: often below ~10 per 100 FTE (≈ ISO < 50).
- Moderate industrial impact: commonly around 10–40 (≈ ISO 50–200).
- Heavy / high-severity periods: often above 40 — investigate long absences and serious injuries.
A falling LWR from aggressive early return-to-work can be real progress — or it can shift days into restricted work without reducing harm. Read LWR with LTCR and leading indicators.
Tips for accurate LWR reporting
- Lock the reporting period before summing days or hours.
- Document whether you use calendar days or scheduled workdays.
- Keep contractor inclusion consistent with your frequency KPIs.
- Reconcile high-day cases with incident investigations and return-to-work outcomes.
- Never place an LWR next to an ISO severity benchmark without converting (× or ÷ 5).
Frequently asked questions
How do I calculate LWR?
Multiply total lost workdays by 200,000, then divide by total hours worked in the same period. Example: 120 days and 800,000 hours → (120 × 200,000) ÷ 800,000 = 30.0.
What is the difference between LWR and severity rate?
Same lost days and hours; different multiplier. LWR uses 200,000 hours (OSHA-style); ISO severity uses 1,000,000 hours. ISO severity = LWR × 5. Always label the base.
What is the difference between LWR and LTCR?
Both often use a 200,000-hour base. LTCR counts lost-time cases. LWR counts days lost. One long absence raises LWR more than LTCR.
Do restricted-work days count?
Only if your written procedure says so. Many organisations count full days away only and track restricted days separately. Keep the rule fixed across periods.
What is a good LWR?
It depends on industry, day-counting rules, and whether a few severe cases dominate. Treat published bands as indicative; compare peers like-for-like and track your own multi-year trend.
