Lifting Plan Quiz: Load Weight, Radius, and Ground Conditions
25 questions
About 13 min
Updated
0 of 25 answered
Score 0
Question 1 of 25
What is the main purpose of a lifting plan?
Question 2 of 25
A load's weight is uncertain and the proposed crane is close to its capacity. What should the planner do?
Question 3 of 25
A load weighs 4,200 kg. A lifting beam weighs 350 kg and slings weigh 150 kg. For this exercise the chart requires all three to be included. What load must be checked against chart capacity?
Question 4 of 25
Which distance is normally relevant when checking a crane chart's operating radius?
Question 5 of 25
The load is to be placed farther from the crane than the pickup point. What must the plan check?
Question 6 of 25
Which load chart should be used for a proposed lift?
Question 7 of 25
The site's available space prevents the planned outrigger extension. What is the correct response?
Question 8 of 25
Why is a crane's headline maximum lifting capacity insufficient for planning?
Question 9 of 25
What must a ground assessment consider beneath a crane setup?
Question 10 of 25
What is the purpose of properly designed outrigger mats or supporting materials?
Question 11 of 25
An outrigger reaction is 240 kN and a mat's effective bearing area is 2 m². What is the simplified average pressure?
Question 12 of 25
Why should a crane setup near an excavation receive specific assessment?
Question 13 of 25
Heavy rain occurs after a lift plan's ground assessment. What should happen before the lift?
Question 14 of 25
A replacement load has the same weight but a much larger surface area. What needs particular review?
Question 15 of 25
Why establish the load's centre of gravity and suitable lifting points?
Question 16 of 25
The crane operator cannot see the load for part of the route. What should the plan establish?
Question 17 of 25
What should happen if the agreed radio communication fails during a lift?
Question 18 of 25
How should an overhead power line affect the plan?
Question 19 of 25
What should the planned lifting route aim to achieve around occupied areas?
Question 20 of 25
Why plan the landing area before picking up the load?
Question 21 of 25
A planned lift requires two cranes to lift one load. How should it be treated?
Question 22 of 25
What is a useful pre-lift briefing expected to establish?
Question 23 of 25
A new obstruction appears on the agreed lift path. What should the crew do?
Question 24 of 25
A crane has a working rated-capacity indicator. What remains necessary?
Question 25 of 25
When can a generic plan for a routine lift continue to be used?
About This Quiz
This lifting plan quiz covers decisions that must be resolved before a crane lift begins. Its 25 questions test load weight, accessories, operating radius, chart selection, ground support, wind, communication, lifting routes and landing arrangements.
What this quiz covers
Review how load and accessory weight interact with the applicable chart, why the greatest relevant radius matters and how changed outriggers or ground conditions affect the plan. Practise recognising when to stop, rebrief or obtain specialist assessment, including for tandem lifts and overhead electrical hazards.
How to use the quiz
Choose one answer for each of 25 questions. The pass mark is 70%, there is no time limit and retakes are allowed. Answer choices are shuffled. Review the correct answers and explanations to identify what to study next.
Scope and standards
This is independent practice material, not an official qualification assessment, lift-planner certification or a substitute for practical competence. General planning principles reference Great Britain HSE guidance; questions that name OSHA address US construction rules. Apply the governing local requirements, crane manufacturer's instructions and a competent lift plan. The two arithmetic exercises state simplified assumptions and do not constitute a crane selection or foundation design.
Sources and further study
The primary sources below were reviewed on 17 November 2026. Read the applicable requirements and equipment instructions before real work.
Test sling inspection knowledge with 25 questions on wire rope, chain and webbing damage, markings and safe use. Includes correct answers and explanations.
Check your understanding of the people and communication arrangements needed for safe vehicle and lifting movements. These 25 original questions cover vehicle banksman duties, crane signalling, slinging interfaces, protected positions, radio checks, lost communication and controlled handovers. The terms describe related activities, but each role needs the competence required for its actual work.
Review the decisions that help keep lifting operations controlled with 25 original multiple-choice questions. Topics include load information, sling configuration, capacity identification, equipment condition, edge protection, safe positions and landing arrangements. The focus is understanding why an arrangement is safe, rather than learning a shortcut for choosing equipment.