Temporary Electrical Installations Quiz: Construction Site Safety
25 questions
About 13 min
Updated
0 of 25 answered
Score 0
Question 1 of 25
Does calling an installation temporary reduce the need for electrical safety?
Question 2 of 25
Who should design and alter a construction site's temporary electrical distribution?
Question 3 of 25
What information should a temporary-power plan consider?
Question 4 of 25
What should happen before a newly assembled site distribution system is made available?
Question 5 of 25
A gang needs another circuit beyond the original temporary-power plan. What is appropriate?
Question 6 of 25
Why should temporary distribution boards be protected from unauthorised access?
Question 7 of 25
What should guide enclosure and connector selection on a wet, dusty site?
Question 8 of 25
How should cables crossing a vehicle route be managed?
Question 9 of 25
A cable route passes through a sharp-edged opening. What is needed?
Question 10 of 25
An open distribution enclosure is taking in rain. What is a suitable response?
Question 11 of 25
What should happen when temporary supply equipment has damaged insulation?
Question 12 of 25
What is an RCD's role in the site electrical system?
Question 13 of 25
What should happen after a site RCD repeatedly trips?
Question 14 of 25
Does operating the RCD test button replace competent inspection and testing of the installation?
Question 15 of 25
What daily care does HSE construction guidance describe for RCDs?
Question 16 of 25
In HSE's construction guidance, why are cordless or 110 V centre-tapped-to-earth tools preferred to ordinary mains tools where suitable?
Question 17 of 25
For a correctly arranged 110 V centre-tapped-to-earth supply described by HSE, what is the maximum nominal voltage from either live conductor to earth?
Question 18 of 25
Can any supply marked 110 V be assumed to have the same centre-tapped-to-earth protection?
Question 19 of 25
What should determine the generator's earthing and protective arrangement?
Question 20 of 25
Does a circuit breaker primarily selected for overcurrent protection automatically provide an RCD's additional shock protection?
Question 21 of 25
What should happen to protective earthing connections when temporary equipment is relocated?
Question 22 of 25
Why consider lighting when planning circuits and RCD protection?
Question 23 of 25
A temporary site lamp has a broken bulb exposing parts. What should happen?
Question 24 of 25
Refurbishment may disturb existing wiring near the temporary supply route. What is needed?
Question 25 of 25
What should a temporary-installation handover make clear?
About This Quiz
This temporary electrical installations quiz covers 25 construction-site safety decisions: competent design and changes, equipment verification, environmental protection, cable routes, RCDs, reduced-voltage supplies, generator arrangements, lighting and controlled handover.
How to use the quiz
Choose one answer for each of 25 questions. The pass mark is 70%, there is no time limit and retakes are allowed. Answer choices are shuffled. Review the correct answers and explanations to identify what to study next.
Scope and standards
This is independent awareness practice, not an official HSE assessment, installation certificate or electrical qualification. The reference context is Great Britain HSE construction guidance and HSG85. The 110 V centre-tapped-to-earth question describes that specific arrangement, not every 110 V supply or a worldwide site requirement. Generator earthing, circuit protection and inspection arrangements require competent design and assessment for the actual installation. The quiz does not supply wiring instructions, circuit calculations or authority to energise a system.
Primary sources
Sources reviewed on 20 November 2026. HSG85 and HSG107 are the third editions, published 2013 and still supplied by HSE at review. Consult current applicable requirements and equipment instructions before actual work.
Test portable electrical safety with 25 questions on plugs, cables, inspections, testing and defect reporting. Includes correct answers and explanations.
Practise safe isolation with 25 questions on identifying supplies, lock-off, proving dead and preventing reconnection. Includes answers and explanations.
Test arc flash awareness with 25 questions on electrical hazards, isolation, boundaries, PPE and safe decisions. Includes correct answers and explanations.
Test your understanding of avoiding cable and pipe strikes before and during excavation. These 25 original questions cover service records, locator limitations, repeated checks, trial holes, safe exposure, authorisation, damage reporting and service protection.