Paper permits to work can suit a site where one permit board gives everyone a reliable view of the jobs in progress. Electronic permits are worth considering when several issuers, crews or shifts need to see the same changes promptly. Before switching, ask the incoming supervisor to identify which jobs are suspended and which equipment must stay isolated. The answer at the permit office should agree with what the crews understand at the job.
A permit to work authorizes specified people to do a defined job, within stated limits, after the necessary precautions have been checked. A paper signature and an electronic approval both record that decision. In either system, the issuer needs time to visit the worksite, check conditions and discuss the job with the person accepting the permit. The UK Health and Safety Executive (HSE) sets out these principles in its permit-to-work guidance. Its 2005 publication HSG250 describes good practice for petroleum, chemical and allied industries.
How paper and electronic permits compare on shift
Follow a permit from issue through a change of shift. The differences show up when someone needs to check another crew’s work, communicate a change or find the signed record.
| Decision on shift | Paper permits | Electronic permits |
|---|---|---|
| Brief the crew | A posted sheet is easy to gather around and needs no login. Handwriting, damage or a missing page can make a critical limit hard to read. | Typed instructions are legible and the permit can link to drawings. Check that employees and contractors can open the current version where the work takes place. |
| Coordinate jobs | An issuer can group permits by area on a board and mark shared isolations by reference number. Each issuing point depends on someone keeping that board current. | A shared register can show several areas at once and flag overlapping work. A wrong equipment identifier or an unrecorded job can hide a conflict. |
| Change or suspend work | The issuer can speak directly to the holder and mark the register. Someone must also update or withdraw the copies that other people rely on. | A change can reach many users at once and leave a dated record. Check who received it, including anyone working from a printout. |
| Retrieve a permit | Numbered forms and a well-kept index let a reviewer trace a job. Filing, matching attachments and retrieving records take staff time. | Search can retrieve the permit, its approvals and linked records together. Test whether the site can still retrieve a complete closed permit after an account or software change. |
The Singapore Chemical Industry Council’s Process & Engineering Committee describes the coordination and record-handling benefits of electronic permits. Whether those features help depends on the information crews enter and who acts on it.
When to keep paper and when to trial an electronic system
Check the applicable rules and contract first. For example, Singapore requires an electronic permit-to-work system among the technologies specified for public-sector construction and construction-related tenders with project sums of S$3 million or more. See the Ministry of Manpower’s public-sector tender requirements.
Keep paper if the people issuing and accepting permits can consistently match the posted copies to the central register, identify related work and brief the next shift. Where workers have limited device access, a legible paper copy can be the easiest way to check limits in the field. Test the arrangement during the busiest handover, when the issuer also needs time for field visits.
Trial an electronic system if updates regularly reach another issuing point late, staff struggle to find current permits or a shutdown makes it hard to track work on the same equipment. Ask two crews to trace their permits to a shared isolation, the safeguard that keeps the equipment disconnected or separated from a hazard. When one crew finishes, the issuer should still be able to see who depends on that isolation. HSE’s assessment checklist asks how the site prevents its removal until every permit that relies on it has been signed off. See HSG250, Appendix 3, questions 12–17.
Compare costs over the same period. For paper, count forms, printing, filing and the time spent carrying updates between locations. For electronic permits, include configuration, devices, licenses, support, training and practice with the backup procedure. Measure time spent moving information separately from time spent inspecting equipment and briefing crews. Those field checks still need people in either system.
What to prove before changing over
Have a permit issuer, a crew supervisor and a contractor use the proposed system on a practice job. Use actual site terminology, forms and equipment references. HSE recommends assessing the risks of changing systems and training people in the permit process as well as the software. Its electronic permit checks appear in HSG250, paragraph 51.
- Check field access. Before taking a tablet or phone into an area classified for explosion risk, verify that it is suitable for that area and permitted by the site. Provide a current printed copy if crews cannot use the device there. See HSE’s guidance on electrical equipment in potentially explosive atmospheres.
- Verify who can issue and accept. Have users sign in under their own identities and demonstrate the limits of their roles. Walk the job with the issuer. The process should prevent issue from a desk without a site visit.
- Check a reused form against the job. Ask the crew supervisor to identify the equipment, limits of work and precautions at this location. Change a detail in the practice job and see whether the team catches an outdated precaution in the template.
- Follow a change to the field. Have the issuer suspend the practice permit. Ask the crew and the incoming shift to show its status and describe what stays isolated. Make sure changes reach everyone affected, including those using a posted copy. HSG250 calls for the ability to print permits for display at the job.
- Account for outstanding permits at the switch. Give one person responsibility for matching each open or suspended permit to its holder, location and linked isolations. Tell all issuing points which register controls the work and when the change takes effect.
Record any mismatch and repeat the affected check after correcting it. For a review that also covers policy, training and supervision, use the permit-to-work system assessment checklist.
How to handle an electronic permit outage
A stack of blank forms cannot tell the next shift which jobs are already under way. Before adopting electronic permits, run an outage drill that covers the work in progress and the return to normal operation. One electricity operator, for example, requires each site to maintain a contingency plan that applies its permit controls on paper if the electronic system or a critical service fails. See Permit to Work Manual, section 15.
Warning. Equipment may still be isolated for a suspended job. If the issuer cannot establish the status of a permit, its precautions or the work that depends on it, stop the affected work safely and hold further authorizations that depend on that information.
- Establish what is live. Notify issuers and crews of the outage. The designated coordinator checks the available register against the field copies and accounts for active and suspended jobs, shared isolations and expiry times.
- Use the agreed backup. Once the coordinator can verify the affected work, use the site’s authorized fallback procedure. If paper is the backup, identify each permit uniquely and record issues, suspensions, handovers and closures in one controlled register. Tell each shift where to find it.
- Reconcile before switching back. Match the backup entries, field copies and isolation records against the restored system. Resolve differences with the responsible issuers and holders. Tell crews which record is current and retire superseded copies. For suspended work, the issuer checks conditions and revalidates the permit or issues a new one before restarting, as described in HSG250, paragraphs 19–21.
Frequently Asked Questions
Crews need the current permit while a job is in progress. Once it closes, the site needs a record it can retrieve.
Does scanning a signed paper permit make the system electronic?
A scan gives you an electronic copy. If people still issue, suspend and close permits on paper, the paper process still controls the job. Scanning can help with retrieval. For work in progress, give crews a way to check the current status and identify who can authorize a change.
Does the format change how long a permit must be kept?
Use the rule that applies to the work and jurisdiction when setting the retention period. For example, in US general industry, an employer covered by the federal permit-required confined spaces standard must retain each canceled entry permit for at least one year for program review and note any problems encountered during entry on that permit. Test that your filing system can retrieve the permit and those notes together. See 29 CFR 1910.146(e)(6).